Открывается в новой вкладке

2 GW+ AI & Hyperscale Data Center Campus Development Opportunity

2 GW+ AI & Hyperscale Data Center Campus Development Opportunity
Отрасль
Технологии
ID объявления
L#20261217
Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено

Описание

Project Racehorse represents a significant opportunity to develop a large-scale AI and hyperscale data center campus on approximately 1,000 acres of industrial land in West Virginia, with potential expansion to approximately 2,000 acres.

The project is strategically positioned within the broader Pittsburgh technology and industrial corridor, approximately 35 miles from Pittsburgh, offering access to established regional infrastructure and major Midwest markets.

The proposed development strategy centers on a dedicated behind-the-meter (BTM) power generation model, targeting an initial capacity of 500 MW within 36 months, with long-term development potential exceeding 2 GW.

The site benefits from access to major energy infrastructure, multiple natural gas supply corridors, potential industrial cooling-water resources, and regional fiber connectivity, creating a compelling foundation for a large-scale digital infrastructure development.

Key Investment Highlights

Substantial Land Position

Approximately 1,000 acres, with potential expansion to approximately 2,000 acres.

Large-Scale Power Potential

Initial 500 MW behind-the-meter generation target within 36 months, with long-term potential exceeding 2 GW.

Strategic Energy Infrastructure

Access to multiple interstate natural gas pipeline systems and nearby high-voltage transmission infrastructure.

Flexible Power Strategy

Potential for dedicated on-site generation, utility grid supply, or alternative power procurement arrangements.

Cooling Infrastructure Potential

Access to the Ohio River, providing an opportunity to develop large-scale industrial cooling-water infrastructure.

Fiber Connectivity

Proximity to multiple regional and national telecommunications networks.

Strategic Location

Approximately 35 miles from Pittsburgh, with access to the wider Midwest technology and data center markets.

Industrial Development Setting

Existing heavy-industrial land-use context potentially suitable for large-scale infrastructure development, subject to confirmation of applicable approvals.

Power & Energy Infrastructure

The proposed energy strategy is based on a phased behind-the-meter generation facility designed to support the anticipated electricity requirements of a hyperscale data center campus.

Parameter Development Target
Initial Power Generation 500 MW
Target Initial Delivery Within 36 months
Long-Term Development Potential 2 GW+
Generation Model Build-Own-Operate
Potential Fuel Source Natural Gas

The site benefits from proximity to established high-voltage transmission infrastructure and multiple natural gas pipeline systems, offering potential flexibility in structuring its long-term energy supply.

The project is considering several potential power procurement strategies, including dedicated on-site generation, utility grid arrangements, and virtual power purchase agreements.

All capacity figures represent development targets and are not currently committed or guaranteed.
Utilities & Supporting Infrastructure
Natural Gas

The location benefits from access to multiple interstate natural gas pipeline corridors, potentially supporting the development of a dedicated gas-fired generation facility.

Water & Cooling

The property's regional setting along the Ohio River offers potential access to substantial industrial cooling-water resources. A dedicated water intake and associated infrastructure would be developed subject to engineering, environmental review, and permitting.

Fiber & Telecommunications

Multiple fiber infrastructure providers operate in the surrounding region, offering potential opportunities for diverse network connections and redundant connectivity.

Grid Infrastructure

Existing high-voltage transmission infrastructure and nearby substations may provide additional grid supply or reserve options, subject to utility studies, interconnection approvals, and capacity availability.

Strategic Location & Connectivity

The project is situated in Hancock County, West Virginia, within the broader Pittsburgh regional market.

  • Approximately 35 miles from Pittsburgh.
  • Access to the wider Ohio River industrial corridor.
  • Regional connectivity to Pittsburgh and Columbus.
  • Proximity to established energy, transportation, and telecommunications infrastructure.

The reported network assessment indicates potential sub-millisecond connectivity to Pittsburgh and approximately 4.84 ms latency to a Columbus network destination, subject to independent technical verification.

This regional positioning may be attractive for AI training, inference, cloud computing, hyperscale operations, and other high-performance computing applications.

Development Potential

The proposed campus is envisioned as a phased development, allowing infrastructure and power generation capacity to expand in line with tenant demand and investment commitments.

Development Phase Target Capacity
Initial Development 500 MW
Long-Term Expansion 2 GW+

Potential development components include:

  • Hyperscale data center facilities.
  • AI and high-performance computing infrastructure.
  • Dedicated power generation facilities.
  • Cooling and water infrastructure.
  • Fiber and telecommunications systems.
  • Supporting industrial and utility infrastructure.

Development Status

Project Racehorse is currently at an early development stage. The land position and surrounding infrastructure provide a foundation for further development, with several key workstreams requiring advancement.

Principal development priorities include:

  • Utility engagement and grid interconnection feasibility.
  • Securing natural gas supply and transportation arrangements.
  • Selection and development of the preferred power generation technology.
  • Engineering and permitting of cooling-water infrastructure.
  • Environmental due diligence and applicable regulatory approvals.
  • Confirmation of fiber connectivity and network capacity.
  • Phased development planning and commercial structuring.

Transaction Overview
Asset: Large-scale industrial land and data center development opportunity
Location: Hancock County, West Virginia, USA
Land Area: Approximately 1,000 acres
Expansion Potential: Approximately 2,000 acres
Initial Power Target: 500 MW
Long-Term Power Potential: 2 GW+
Asking Price: Available Upon Request, subject to seller confirmation.

Further information regarding ownership, exact location, technical reports, infrastructure arrangements, and development documentation may be made available to qualified parties following execution of a Non-Disclosure Agreement (NDA).

Основные данные

ID объявления
L#20261217
Страна
Соединенные Штаты
Отрасль
Технологии
Статус сделки
Доступно
Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Мультипликатор выручки
Уточняется
Мультипликатор EBITDA
Уточняется

Консультирование по M&A в среднем сегменте – Deal Tombstones 2024

КонсультантDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Компании на продажу

Похожие предложения

Соединенные ШтатыСоединенные ШтатыТехнологииL#20261214

149.8MW Powered-Land Data Center Development

Project represents a powered-land development opportunity in East Texas, strategically located in Grand Saline, Van Zandt County, within the ERCOT electricity market.The project offers approximately 137.5 acres of approved and contracted land, with an additional 108.4 acres identified for potential…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261216

7GW Hyperscale Data Center & Powered Land Development Platform

The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation. The platform combines titled…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261219

500MW Large-Scale Data Center & Power Development

Project Racehorse represents a large-scale campus development opportunity in New Cumberland, West Virginia, strategically positioned along the Ohio River corridor and within proximity to Pittsburgh. The project combines a substantial industrial development footprint with the potential for a dedicated behind-the-meter…

Целевая цена
$75,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261224

55.5 MW Data Center Development in the Southeastern United States

The project is structured around long-term contracted data center capacity, an established rental model and phased revenue generation. INVESTMENT AT A GLANCE Key metric Project overview Total planned IT capacity 55.5 MW Initial grid-powered capacity 5.5 MW Planned gas-powered expansion…

Целевая цена
$200,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261225

150 MW Data Center Development Opportunity with 40 Acres of Land in Texas

Astrategically positioned land and power development project in Texas, featuring a 40-acre site, a planned 150 MW power capacity across two phases, and potential for contiguous campus expansion. INVESTMENT AT A GLANCE Key metric Project overview Asking price $100 million…

Целевая цена
$100,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261227

42MW Grid-Powered Capacity + 50MW Gas Expansion with Long-Term Recurring Revenue

An opportunity to participate in a large-scale data center development in Texas, combining phased grid-connected capacity with an additional gas-powered expansion. The project features a long-term rental model, tenant-backed credit support and a structured project-level financing arrangement. INVESTMENT AT A…

Целевая цена
$400,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261226

3.35GW Energy & AI Data Center Campus with 2,100 Acres in Texas

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity. PROJECT AT A GLANCE…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261211

69MW Strategic Industrial Redevelopment & Infrastructure Investment Opportunity

This Project presents a rare opportunity to acquire a fully infrastructure-loaded legacy steel campus in Weirton, West Virginia, situated along the Ohio River in the heart of the Upper Ohio Valley. The site features over 3.3 million square feet of…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено