Открывается в новой вкладке

100MW On-Grid Data Center RTB Development Site

100MW On-Grid Data Center RTB Development Site
Страна
КанадаКанада
Отрасль
Технологии
ID объявления
L#20261130
Целевая цена
$45,000,000
Выручка
$78,000,000
EBITDA
$70,000,000

Описание

A shovel-ready data center development opportunity offering 100MW of immediately available on-grid power on a 20-acre parcel. The site is pre-designed for modular infrastructure and targeted at high-density compute applications, including Artificial Intelligence (AI), High-Performance Computing (HPC), hyperscale cloud facilities, and digital asset mining. By eliminating standard multi-year utility interconnection delays, the site provides a rapid route to energization and operation.

Key Asset & Commercial Terms

Parameter Details
Power Capacity

100MW (Immediate on-grid availability)

Power Rate

$0.07 / kWh

Land Area

20 acres

Site Plan

Designed for 100MW modular data center infrastructure

Land Tenure

99-year long-term lease

Development Status

Ready for immediate development & energization

Included CapEx

$10,000,000 substation transformer included in the purchase price

Key Investment Highlights

Immediate Speed-to-Market

Access to energized large-scale grid capacity significantly bypasses standard queue times for power allocation and transmission buildout.

Long-Term Site Control

Secured under a 99-year lease structure, supporting extended institutional holding periods and multi-phase deployments.

Pre-Funded Major Infrastructure

The inclusion of the $10M substation transformer directly offsets initial capital expenditure and mitigates long-lead equipment procurement risk.

Competitive Operating Costs

An on-grid power tariff of $0.07/kWh ensures attractive operational cost profiles for high-load workloads.

Technical documentation, engineering layouts, and due diligence packages are available upon request for qualified buyers.

Metric Model A: Wholesale AI / Hyperscale Colocation (Triple-Net / NNN) Model B: Powered Shell / Infrastructure Lease Model C: High-Density AI Cloud / High-Power Compute Hosting
Description Turnkey data center facility; tenant pays base rent + pass-through power Long-term lease of powered land, transformer, and shell structure Fully managed infrastructure / high-density compute hosting
Pricing Benchmark $130 – $165 per kW / month (base capacity rent, power passed through) $45 – $65 per kW / month (pure infrastructure / powered capacity lease) $0.10 – $0.12 per kWh (all-in rate bundling power & site ops)
Annual Gross Revenue $156M – $198M $54M – $78M $87.6M – $105.1M
Estimated EBITDA Margin 65% – 75% 85% – 92% 40% – 50%
Estimated Annual EBITDA $105M – $145M $48M – $70M $35M – $52M
Estimated Development CapEx Required High ($700M – $900M+ for turnkey modular buildout) Low–Moderate ($80M – $150M for site civil & powered shell) Moderate ($150M – $250M for high-density modular pods)

Informational & Preliminary Nature Only This summary is provided for informational and preliminary evaluation purposes only and does not constitute an offer to sell, a solicitation of an offer to buy, or a recommendation to enter into any transaction or purchase any securities, real property, or assets. Any transaction will be subject to the negotiation and execution of definitive, legally binding documentation.

Forward-Looking Statements & Projections

Any financial projections, estimates, benchmarks, revenue ranges, or EBITDA forecasts contained herein are forward-looking statements based on current industry assumptions, market conditions, and hypothetical operating models. These statements involve substantial risks, uncertainties, and assumptions, including but not limited to:

  • Fluctuations in local and national power markets, regulatory tariffs, and utility interconnection rules.

  • Variations in construction timelines, supply chain availability, and capital expenditure costs for modular, powered-shell, or turnkey builds.

  • Shifting demand, pricing dynamics, and vacancy rates in the data center, AI/HPC, and cloud infrastructure sectors.

  • Macroeconomic factors, including interest rates, tax laws, and general financing market conditions.

Actual operational and financial results may differ materially from those expressed or implied in these projections. Past performance and illustrative scenarios are not guarantees of future performance.

Independent Due Diligence & Verification Neither the seller, broker, advisors, nor their respective affiliates, officers, or representatives make any express or implied representation or warranty regarding the accuracy, completeness, or reliability of the information provided herein (including utility availability, zoning, environmental conditions, site acreage, or equipment specifications).

Prospective purchasers, investors, and developers are solely responsible for conducting their own independent technical, legal, engineering, financial, environmental, and tax due diligence. Recipients are strongly advised to consult with their own professional legal, financial, and technical advisors before committing capital or executing binding agreements.

Основные данные

ID объявления
L#20261130
Страна
Канада
Отрасль
Технологии
Статус сделки
Доступно
Целевая цена
$45,000,000
Выручка
$78,000,000
EBITDA
$70,000,000
Мультипликатор выручки
0.58x
Мультипликатор EBITDA
0.64x

Консультирование по M&A в среднем сегменте – Deal Tombstones 2024

КонсультантDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Компании на продажу

Похожие предложения

Соединенные ШтатыСоединенные ШтатыТехнологииL#20261227

42MW Grid-Powered Capacity + 50MW Gas Expansion with Long-Term Recurring Revenue

An opportunity to participate in a large-scale data center development in Texas, combining phased grid-connected capacity with an additional gas-powered expansion. The project features a long-term rental model, tenant-backed credit support and a structured project-level financing arrangement. INVESTMENT AT A…

Целевая цена
$400,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261226

3.35GW Energy & AI Data Center Campus with 2,100 Acres in Texas

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity. PROJECT AT A GLANCE…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261214

149.8MW Powered-Land Data Center Development

Project represents a powered-land development opportunity in East Texas, strategically located in Grand Saline, Van Zandt County, within the ERCOT electricity market.The project offers approximately 137.5 acres of approved and contracted land, with an additional 108.4 acres identified for potential…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261216

7GW Hyperscale Data Center & Powered Land Development Platform

The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation. The platform combines titled…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261217

2 GW+ AI & Hyperscale Data Center Campus Development Opportunity

Project Racehorse represents a significant opportunity to develop a large-scale AI and hyperscale data center campus on approximately 1,000 acres of industrial land in West Virginia, with potential expansion to approximately 2,000 acres. The project is strategically positioned within the…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261219

500MW Large-Scale Data Center & Power Development

Project Racehorse represents a large-scale campus development opportunity in New Cumberland, West Virginia, strategically positioned along the Ohio River corridor and within proximity to Pittsburgh. The project combines a substantial industrial development footprint with the potential for a dedicated behind-the-meter…

Целевая цена
$75,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261224

55.5 MW Data Center Development in the Southeastern United States

The project is structured around long-term contracted data center capacity, an established rental model and phased revenue generation. INVESTMENT AT A GLANCE Key metric Project overview Total planned IT capacity 55.5 MW Initial grid-powered capacity 5.5 MW Planned gas-powered expansion…

Целевая цена
$200,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261225

150 MW Data Center Development Opportunity with 40 Acres of Land in Texas

Astrategically positioned land and power development project in Texas, featuring a 40-acre site, a planned 150 MW power capacity across two phases, and potential for contiguous campus expansion. INVESTMENT AT A GLANCE Key metric Project overview Asking price $100 million…

Целевая цена
$100,000,000
Выручка
Уточняется
EBITDA
Будет объявлено