Открывается в новой вкладке

187.89-Acre Waterfront Industrial Campus AI Data Center & Energy Infrastructure

187.89-Acre Waterfront Industrial Campus AI Data Center & Energy Infrastructure
Отрасль
Технологии
ID объявления
L#20261142
Целевая цена
$75,000,000
Выручка
$188,300,000
EBITDA
$169,300,000

Описание

A rare opportunity to acquire approximately 187.89 acres of contiguous waterfront industrial land in Florida, positioned for evaluation as a large-scale AI / hyperscale data center and energy infrastructure campus. The site combines substantial land area with access to electricity, natural gas, water, sewer, rail, marine and highway infrastructure, creating the potential for an integrated data center and onsite-energy development strategy.

KEY INVESTMENT HIGHLIGHTS

  • 187.89 acres of contiguous waterfront industrial land
  • Florida location within an established industrial and logistics corridor
  • Approximately 84 acres of historically identified upland development area, subject to current survey and wetland delineation
  • Potential for AI / hyperscale data center development
  • Natural gas infrastructure reportedly available at the property gate
  • Potential to evaluate gas-supported onsite generation at up to ~1,000 MW, subject to capacity, engineering, permitting and regulatory approvals
  • Electrical infrastructure and regional generation resources in proximity
  • Water, sewer and electric service lines located along the access corridor
  • Direct paved-road access with railhead access from the property line
  • Potential for phased development incorporating data centers, generation, substations, BESS, cooling and supporting infrastructure
  • Additional potential for waterfront leasing / outparcel development to maritime or industrial users

DATA CENTER & ENERGY CAMPUS POTENTIAL

The scale and industrial setting of the property provide an opportunity to evaluate a vertically integrated AI infrastructure campus, potentially combining:

AI / Hyperscale Data Centers
→ Onsite Natural-Gas Generation
→ Substation & Electrical Infrastructure
→ Battery Energy Storage
→ Cooling & Water Infrastructure
→ Fiber / Connectivity
→ Industrial & Maritime Support Uses

The potential 1,000 MW generation scale should be viewed strictly as a development scenario requiring confirmation through gas-delivery analysis, utility studies, engineering, emissions modeling, permitting and final approvals.

CRITICAL ENTITLEMENT REQUIREMENT
Data center zoning and entitlement must be secured prior to development.

The buyer will need written confirmation from the applicable authorities regarding the permissibility of the proposed data center, onsite generation, substations, BESS, cooling infrastructure and associated utility improvements.

Depending on the final determination, the project may require conditional use approval, PUD modification, rezoning, exception or other entitlement actions.

Accordingly, the acquisition should be structured subject to satisfactory zoning and entitlement diligence.

TRANSACTION OVERVIEW

Item Details
Location Florida
Asset Type Waterfront Industrial Land
Total Land Area 187.89 acres
Potential Upland Area ~84 acres, subject to verification
Potential Use AI / Hyperscale Data Center & Energy Campus
Potential Generation Scale Up to ~1,000 MW, subject to feasibility & approvals
Asking Price $75 million
Transaction Type Buy-Side Acquisition
Status Subject to zoning, environmental, utility and technical due diligence
Line Item Y1 Y2 Y3 Y4 Y5 Y6 (Stabilized) Y7 Y8 Y9 Y10
Gross Operating Revenue
Wholesale IT Capacity Rent — — 174.0 356.7 549.3 563.1 577.1 591.6 606.4 621.5
Energy Management Spread — — 11.8 24.3 37.4 38.4 39.3 40.3 41.3 42.4
Maritime Outparcel Ground Lease — — 2.5 2.6 2.6 2.7 2.8 2.8 2.9 3.0
Total Revenue — — 188.3 383.6 589.3 604.2 619.2 634.7 650.6 666.9
Cost of Goods Sold (COGS)
Power Plant O&M & Operations — — (6.5) (13.5) (20.5) (21.0) (21.5) (22.1) (22.6) (23.2)
Facility Engineering & Critical Systems — — (2.5) (5.0) (7.8) (8.0) (8.2) (8.4) (8.6) (8.8)
Total COGS — — (9.0) (18.5) (28.3) (29.0) (29.7) (30.5) (31.2) (32.0)
Gross Profit — — 179.3 365.1 561.0 575.2 589.5 604.2 619.4 634.9
Gross Margin (%) — — 95.2% 95.2% 95.2% 95.2% 95.2% 95.2% 95.2% 95.2%
Operating Expenses (SG&A)
Real Estate Property Taxes (1.5) (1.8) (5.5) (11.0) (17.0) (17.4) (17.9) (18.3) (18.8) (19.3)
Property & Casualty Insurance (1.0) (1.2) (3.0) (5.0) (7.0) (7.2) (7.3) (7.6) (7.7) (7.9)
Campus Administration & Security — — (1.5) (2.5) (3.5) (3.6) (3.7) (3.8) (3.9) (4.0)
Total Operating Expenses (2.5) (3.0) (10.0) (18.5) (27.5) (28.2) (28.9) (29.7) (30.4) (31.2)
EBITDA (2.5) (3.0) 169.3 346.6 533.5 547.0 560.6 574.5 589.0 603.7
EBITDA Margin (%) — — 89.9% 90.4% 90.5% 90.5% 90.5% 90.5% 90.5% 90.5%
Depreciation & Amortization (D&A) — — (57.9) (115.8) (173.7) (173.7) (173.7) (173.7) (173.7) (173.7)
Operating Income (EBIT) (2.5) (3.0) 111.4 230.8 359.8 373.3 386.9 400.8 415.3 430.0
Operating Margin (%) — — 59.2% 60.2% 61.1% 61.8% 62.5% 63.2% 63.8% 64.5%
Pre-Tax Income (EBT) (2.5) (3.0) 111.4 230.8 359.8 373.3 386.9 400.8 415.3 430.0
Income Tax Expense (25.0%)* 0.0 0.0 (26.5) (57.7) (90.0) (93.3) (96.7) (100.2) (103.8) (107.5)
Net Income (2.5) (3.0) 84.9 173.1 269.8 280.0 290.2 300.6 311.5 322.5
Net Income Margin (%) — — 45.1% 45.1% 45.8% 46.3% 46.9% 47.4% 47.9% 48.4%

All development potential, infrastructure capacity and generation figures are indicative and subject to independent verification, feasibility studies, utility confirmation, permitting, zoning/entitlement approvals and satisfactory due diligence. No representation is made that the site is currently entitled for data center development.
IMPORTANT DISCLAIMER & NOTICE

This preliminary financial model and development analysis are prepared strictly for illustrative and conceptual underwriting purposes. This document does not constitute an offer to sell, a solicitation of an offer to buy, or an investment recommendation. All projections, estimates, construction costs, power capacities, timeline assumptions, and revenue metrics are indicative and rely on preliminary third-party data subject to comprehensive technical, environmental, civil, and legal validation.

The subject property is currently raw industrial land and is not entitled for data center or private power generation use. Realization of the project requires successful rezoning/PUD modifications, wetland delineations, Title V air quality permits, gas interconnection studies, electric interconnection studies, and water consumption rights. Unforeseen geotechnical conditions, gas pipeline constraints, tariff changes, supply chain lead times (e.g., turbine and transformer delivery), and environmental restrictions will materially affect actual results.

Основные данные

ID объявления
L#20261142
Страна
Соединенные Штаты
Отрасль
Технологии
Статус сделки
Доступно
Целевая цена
$75,000,000
Выручка
$188,300,000
EBITDA
$169,300,000
Мультипликатор выручки
0.4x
Мультипликатор EBITDA
0.44x

Консультирование по M&A в среднем сегменте – Deal Tombstones 2024

КонсультантDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Компании на продажу

Похожие предложения

Соединенные ШтатыСоединенные ШтатыТехнологииL#20261226

3.35GW Energy & AI Data Center Campus with 2,100 Acres in Texas

A large-scale energy and data center development opportunity comprising a 2,100-acre site in South Texas, designed to support hyperscale AI and data center operations through dedicated behind-the-meter power generation, energy storage and independent merchant power capacity. PROJECT AT A GLANCE…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261214

149.8MW Powered-Land Data Center Development

Project represents a powered-land development opportunity in East Texas, strategically located in Grand Saline, Van Zandt County, within the ERCOT electricity market.The project offers approximately 137.5 acres of approved and contracted land, with an additional 108.4 acres identified for potential…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261216

7GW Hyperscale Data Center & Powered Land Development Platform

The project represents a large-scale powered-land acquisition opportunity in the Permian Basin, West Texas, comprising a portfolio of seven secured development sites with the potential to support up to 7 GW of behind-the-meter (BTM) power generation. The platform combines titled…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261217

2 GW+ AI & Hyperscale Data Center Campus Development Opportunity

Project Racehorse represents a significant opportunity to develop a large-scale AI and hyperscale data center campus on approximately 1,000 acres of industrial land in West Virginia, with potential expansion to approximately 2,000 acres. The project is strategically positioned within the…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261219

500MW Large-Scale Data Center & Power Development

Project Racehorse represents a large-scale campus development opportunity in New Cumberland, West Virginia, strategically positioned along the Ohio River corridor and within proximity to Pittsburgh. The project combines a substantial industrial development footprint with the potential for a dedicated behind-the-meter…

Целевая цена
$75,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261224

55.5 MW Data Center Development in the Southeastern United States

The project is structured around long-term contracted data center capacity, an established rental model and phased revenue generation. INVESTMENT AT A GLANCE Key metric Project overview Total planned IT capacity 55.5 MW Initial grid-powered capacity 5.5 MW Planned gas-powered expansion…

Целевая цена
$200,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261225

150 MW Data Center Development Opportunity with 40 Acres of Land in Texas

Astrategically positioned land and power development project in Texas, featuring a 40-acre site, a planned 150 MW power capacity across two phases, and potential for contiguous campus expansion. INVESTMENT AT A GLANCE Key metric Project overview Asking price $100 million…

Целевая цена
$100,000,000
Выручка
Уточняется
EBITDA
Будет объявлено
Соединенные ШтатыСоединенные ШтатыТехнологииL#20261227

42MW Grid-Powered Capacity + 50MW Gas Expansion with Long-Term Recurring Revenue

An opportunity to participate in a large-scale data center development in Texas, combining phased grid-connected capacity with an additional gas-powered expansion. The project features a long-term rental model, tenant-backed credit support and a structured project-level financing arrangement. INVESTMENT AT A…

Целевая цена
$400,000,000
Выручка
Уточняется
EBITDA
Будет объявлено