Открывается в новой вкладке

280MW LNG-to-Power Platform with 20-Year USD-Indexed Firm Energy Contract

280MW LNG-to-Power Platform with 20-Year USD-Indexed Firm Energy Contract
Страна
КолумбияКолумбия
ID объявления
L#20261158
Целевая цена
Цена по запросу
Выручка
$41,110,000
EBITDA
$29,600,000

Описание

Colombia's power system is structurally exposed: around 80% of generation is hydro, the country's largest gas field (in production since 1977 and supplying roughly 80% of domestic output) is in decline, and El Niño droughts regularly push spot prices above USD 0.20/kWh. To secure supply, the regulator awards long-term Firm Energy Obligations (OEF) through a reliability-auction mechanism in force since 2008. USD-denominated, inflation-indexed 20-year contracts that have become one of Latin America's most bankable power revenue streams. Against this backdrop, a privately held, family-owned energy developer offers investors participation in an integrated LNG-to-Power platform on Colombia's Caribbean coast, anchored by a Firm Energy contract awarded in the country's 2026 auction.

Investment Highlights

  1. 01
    Awarded 20-year Firm Energy contract (2029–2049)USD-denominated, indexed at PPI +2.5% p.a., no FX risk; USD 41M base annual revenue and USD 1.2B cumulative over the term
  2. 02
    280 MW net dual-fuel plant (gas / ULSD)guarantees 100% dispatch during El Niño scarcity events
  3. 03
    Qualified expansion to 2,240 MW net (2,500 MW gross)the only LNG-to-Power project in the Colombian Firm Energy auction process
  4. 04
    Dedicated FSRU LNG import terminal170,000 m³ storage/ 400,000 MCF/day regasification; market value USD 320M at zero incremental capex to the power project
  5. 05
    Three linked profit streams from one asset basecontracted power revenue, FSRU gas sales margin (USD 1.18/MCF), and the terminal's own return (target > 18% ROE)
  6. 06
    Advanced development stageEPC contract (USD 195M) and engine technology selected, 220 kV interconnection <500 m from site, construction planned from 2027
  7. 07
    Capex-light optionalityFSRU can be owned or secured under long-term lease (USD 47–57M p.a.)

Platform Overview

The platform combines three complementary assets under one ownership group. Phase 1 is a 280 MW net (3 × 94 MW) dual-fuel reciprocating-engine plant with an awarded 20-year Firm Energy Obligation, early COD targeted for late 2027–2028 and contractual COD in 2029. Phase 2 is a qualified LNG-fuelled expansion of 2,240 MW net, interconnecting to the 500 kV national grid. Both are supplied by a dedicated floating storage and regasification unit (FSRU) located in a deep-water Caribbean port cluster with direct pipeline access to the national gas network. Beyond fuelling the plants, the terminal delivers up to 400,000 MCF/day of regasified gas to domestic utilities and industrial users, so the same infrastructure asset generates a second, independent margin. The structure supports non-recourse project financing backed by the 20-year contracted revenue stream.

Market Opportunity

Colombia's gas market is structurally undersupplied. Domestic production is falling as the main field depletes, and the country's only existing LNG regasification terminal serves just three power plants. Utilities, gas distributors and industrial consumers are actively seeking long-term, guaranteed supply, while the regulator continues to award Firm Energy contracts to thermal capacity able to back up the hydro-dependent grid. The platform's site is the only viable Caribbean location combining a deep-water port, an existing generation cluster and pipeline connectivity, positioning it as the natural replacement for declining domestic supply and as a strategic asset for LNG midstream, trading and power players entering the Andean market.

Financial Snapshot

Metric Value Basis
Contracted volume ~6,500 MWh/day Firm Energy Obligation, 20 years
Year-1 base revenue ~USD 41.1M PCVS USD 16–17/MWh, indexed PPI + 2.5% p.a.
20-yr cumulative revenue ~USD 1.2B 2029–2049, USD-denominated
Phase 1 EPC value ~USD 195M Consolidated EPC contract
FSRU market value ~USD 320M Zero incremental capex to power project
LNG terminal capital cost < USD 325M Or long-term lease at USD 47–57M p.a.
Gas sales margin ~USD 1.18 / MCF On up to 400,000 MCF/day
Target return > 18% ROE LNG import project
Key milestones 2027–2028 / mid-2028 Phase 1 construction & early COD/ terminal commissioning
Line Item (USD M) Year 1 (2029) Year 5 (2033) Year 10 (2038) Year 15 (2043) Year 20 (2048)
Firm Energy Revenue (OEF) $41.1 $49.0 $61.1 $76.1 $94.8
Power Plant Fixed O&M ($8.5) ($9.4) ($10.6) ($12.0) ($13.6)
Insurance, SG&A, Land Leases ($3.0) ($3.3) ($3.7) ($4.2) ($4.8)
EBITDA $29.6 $36.3 $46.8 $59.9 $76.4
EBITDA Margin 72.0% 74.1% 76.6% 78.7% 80.6%
Depreciation (20-yr Straight-Line) ($11.0) ($11.0) ($11.0) ($11.0) ($11.0)
EBIT $18.6 $25.3 $35.8 $48.9 $65.4
Senior Interest Expense ($11.6) ($9.5) ($5.9) ($0.9) $0.0
EBT $7.0 $15.8 $29.9 $48.0 $65.4
Corporate Income Tax (35%) ($2.5) ($5.5) ($10.5) ($16.8) ($22.9)
Net Income $4.5 $10.3 $19.4 $31.2 $42.5
(+) Depreciation & Non-Cash $11.0 $11.0 $11.0 $11.0 $11.0
(-) Senior Debt Principal Amortization ($5.8) ($7.8) ($11.3) ($16.4) $0.0
Free Cash Flow to Equity (FCFE) $9.7 $13.5 $19.1 $25.8 $53.5
Debt Service Coverage Ratio (DSCR) 1.70x 2.10x 2.72x 3.46x N/A (Debt Free)

Основные данные

ID объявления
L#20261158
Страна
Колумбия
Отрасль
Возобновляемая энергия
Статус сделки
Доступно
Целевая цена
Цена по запросу
Выручка
$41,110,000
EBITDA
$29,600,000
Мультипликатор выручки
Уточняется
Мультипликатор EBITDA
Уточняется

Консультирование по M&A в среднем сегменте – Deal Tombstones 2024

КонсультантDeals
MergersCorp M&A International21
Keith Advisory17
GCG9
JP Morgan41
Jefferies23
Lazard26
Goldman Sachs30

Компании на продажу

Похожие предложения

ИталияИталияВозобновляемая энергияL#20261228

12.73MW Agrivoltaic Solar Project

A 12.73 MWp agrivoltaic solar photovoltaic project located in the Lazio region of central Italy. The project covers approximately 20.32 hectares and is designed to combine renewable electricity generation with continued agricultural land use. Its technical configuration achieves a Land…

Целевая цена
Цена по запросу
Выручка
Уточняется
EBITDA
Будет объявлено
ИталияИталияВозобновляемая энергияL#2026129

510 kW Hydroelectric Power Plant

An integrated analysis of the technical specifications, eleven-year energy generation records, and financial statements outlines a run-of-river hydroelectric facility characterized by high operating margins, operational resilience, and long-term regulatory protection. 1. Technical Profile & Concession Framework Location & Watercourse: River…

Целевая цена
€4,500,000
Выручка
€732,985
EBITDA
€592,385
ВеликобританияВеликобританияВозобновляемая энергияL#20261203

99.9MW UK Battery Energy Storage System [Q4-2027 RTB]

The UK Battery Energy Storage System (BESS) market presents attractive opportunities for investors as the country continues to expand renewable energy generation and modernise its electricity infrastructure. Battery storage systems play a vital role in balancing electricity supply and demand,…

Целевая цена
£7,500,000
Выручка
Уточняется
EBITDA
Будет объявлено
ВеликобританияВеликобританияВозобновляемая энергияL#20261206

37.5MW UK Solar Energy Project [Q4-2027 RTB]

The UK solar energy market continues to offer opportunities for investors seeking exposure to renewable power generation and the country's transition towards a lower-carbon energy system. Solar projects can contribute to the diversification of electricity supply and support the growing…

Целевая цена
£3,187,500
Выручка
Уточняется
EBITDA
Будет объявлено
ВеликобританияВеликобританияВозобновляемая энергияL#20261204

70MW UK Battery Energy Storage System [Q4-2027 RTB]

The UK Battery Energy Storage System (BESS) market offers investment opportunities driven by the growing need for grid flexibility, energy security and the integration of renewable energy sources. Battery storage assets help balance electricity supply and demand, manage fluctuations in…

Целевая цена
£4,200,000
Выручка
Уточняется
EBITDA
Будет объявлено